[BlockC]Progress in December 2017

By Monday January 15th, 2018 Construction Progress

PDF: Bodaiju-Site-Progress-Report_Vol.13-BlockC

RE-BAR FABRICATION WORKSHOP (BUILDING C)
We have a workshop inside our site to fabricate Re-Bar for our Building C Structure.
Picture17 Picture18

FORM-WORK FABRICATION WORKSHOP (BUILDING C)
We have a workshop inside our site to fabricate Form-Work for our Building C Structure.
Picture19 Picture20

RF_SLAB FORM WORK AND REINFORCEMENT WORK (BUILDING C)
This is our site activities for Form Work and Reinforcement Work of Roof Floor in this December 2017 as our final super structure of this building C
Picture21 Picture22
Picture23 Picture24

RF_CONCRETE TESTING WORK (BUILDING C)
In this December 2017, We casted concrete for Roof Floor which is complete our super structure work. This is our activities of concrete testing at site before casting.
Picture25 Picture26

RF_SLAB CONCRETE WORK WORK (BUILDING C)
This is Roof Floor floor Slab concrete work for our Building C which completed in this December 2017 faster than our planning.
Picture27 Picture28

WALL FINISHING WORK (BUILDING C)
This is our site activities of Wall Finishing Work in this December 2017
Picture29 Picture30

CEILING WORK (BUILDING C)
Ceiling Work is under progressing at our building C, December 2017.
Picture31 Picture32

FLOOR FINISHING WORK (BUILDING C)
This is our site activities of Floor Finishing Work with tiling of building C in this December 2017.
Picture33 Picture34

FITTING OUT WORK (BUILDING C)
This is our site activities of Fitting Out Work. Door Installation works of building C in this December 2017.
Picture35 Picture36