[Block C] Progress in May

By Wednesday June 6th, 2018 Construction Progress

PDF: Bodaiju-Site-Progress-Report_Vol.17-BlockC

MEP WORK (BUILDING C)
This is our site activities of MEP Work in this May 2018. These are our site progressing activities photos of Bodaiju Building C.
picture picture2
picture3 picture4

WALL PLASTERING WORK (BUILDING C)
This is our site activities of Wall Plastering Work in this May 2018. This plastering work is one of the important work to make nice wall finishing work.
picture5 picture6
picture7 picture8

WALL FINISHING WORK (BUILDING C)
This is our site activities of Wall Finishing Work in this May 2018. There are the combination of Brick Work, Plastering Work, Painting and Tiling Work as our wall finishing.
picture9 picture10
picture11 picture12

CEILING WORK (BUILDING C)
This is our site activities of Ceiling Work of Building C in this May 2018. We start from Framing, Paneling, Joining and Painting as the finishing.
picture13 picture14
picture15 picture16

FLOOR FINISHING WORK (BUILDING C)
This is our site activities of Floor Finishing Work with tiling of building C in this May 2018.
picture17 picture18
picture19 picture20

FITTING OUT WORK (BUILDING C)
This is our site activities of Fitting Out Work of building C in this May 2018. Door and Windows Installation progress activities photos.
picture21 picture22
picture23 picture24

ROOF TOP LANSCAPE WORK (BUILDING C)
This is our site activities of Landscape Work of building C on the roof top in this May 2018.
picture25 picture26
picture27 picture28