[Block C] Progress in August

By Friday September 7th, 2018 Construction Progress

PDF: Bodaiju-Site-Progress-Report_Vol.20-BlockC

MEP WORK (BUILDING C)
This is our site activities of MEP Work in this August 2018. These are our site progressing activities photos of Bodaiju Building C.
picture1 picture2
picture3 picture4

WALL FINISHING WORK (BUILDING C)
This is our site activities of Wall Finishing Work in this August 2018. Currently we are doing Painting and Tiling Work as our wall finishing.
picture5 picture6
picture7 picture8

CEILING WORK (BUILDING C)
This is our site activities of Ceiling Work of Building C in this August 2018. We are doing Ceiling Painting as the finishing.
picture9 picture10
picture11 picture12

FLOOR FINISHING WORK (BUILDING C)
This is our site activities of Floor Finishing Work with tiling of building C in this August 2018.
picture13 picture14
picture15 picture16

FITTING OUT WORK (BUILDING C)
This is our site activities of Fitting Out Work of building C in this August 2018. Door and Windows Installation progress activities photos.
picture17 picture18
picture19 picture20

ROOF TOP LANSCAPE WORK (BUILDING C)
This is our site activities of Landscape Work of building C on the roof top in this August 2018.
picture21 picture22
picture23 picture24