Progress in July 2016

By Monday August 8th, 2016 Construction Progress

Download PDF : Bodaiju-Site-Progress-Report_Vol.9_Aug2016

JULY 2016 SITE VIEW (BUILDING A & B)

In July 2016 we already complete the 2nd  Floor Structure Work. We keep tracking on our schedule with the standard quality. We plan to compete 7th Floor Concreting Work by end of October 2016.

Picture1 Picture2

Picture3 Picture4

2FL-BEAM & SLAB FORM WORK (BUILDING A & B)

2nd Floor Beam and Slab Form Work installation activities in our construction site in July 2016.

Picture5 Picture7

2FL-BEAM & SLAB REINFORCEMENT (BUILDING A & B)

Reinforcement Work site activities of Building A & B on 2nd Floor which completed.

Picture6 Picture8

2FL-RE-BAR CHECK & CLEANING (BUILDING A & B)

We keep checking to bring quality for our valued clients. This is cleaning work before casting concrete.

Picture9 Picture10

2FL-CONCRETE TEST AT SITE

Mixed-Concrete was tested at site before casting 2nd Floor Structure, Slab and Beam.

Picture11 Picture12

2FL-MEP WORK (BUILDING A & B)

Pipe for electricity in 2nd Floor Slab was laid and our engineer checking strictly on MEP works to be ready for concreting.

Picture13  Picture14

2F-CONCRETE WORK AT SITE

Concrete Work for 2nd Floor Level of Building A & B was completed in July 2016. This is casting activity at night at site

Picture15 Picture16

 MOSQUITO PREVENTION (BUILDING A & B)

We are bringing the safety working environment in our construction site. Mosquito Prevention activities in July 2016.

Picture17 Picture18

Picture19 Picture20