[BlockC]Progress in March 2017

By Friday April 7th, 2017 Construction Progress

Download PDF: Bodaiju-Site-Progress-Report_Vol.3-BlockC

RE-BAR FABRICATION WORKSHOP (BUILDING C)
We have a workshop inside our site to fabricate Re-Bar for our Building C Structure.
Picture1 Picture2

FORM-WORK FABRICATION WORKSHOP (BUILDING C)
We have a workshop inside our site to fabricate Form-Work for our Building C Structure.
Picture3 Picture4

P1_COLUMN REINFORCEMENT WORK (BUILDING C)
Installation of Reinforcement for P1 Floor Column at Building C.
Picture5 Picture6

P1_COLUMN FORM WORK (BUILDING C)
Installation of Form Work activities at site this March 2017.
Picture7 Picture8

P2_BEAM & SLAB REINFORCEMENT WORK (BUILDING C)
Now we are P2 Floor, Beam and Slab Reinforcement Work activities at our construction site of Building C.
Picture9 Picture10

P2_BEAM & SLAB FORM WORK (BUILDING C)
Now we are P2 Floor, Erection of Beam and Slab Form Work activities at Bodaiju Construction Site.
Picture11 Picture12