PDF: Bodaiju-Site-Progress-Report_Vol.4-BlockC
RE-BAR FABRICATION WORKSHOP (BUILDING C)
We have a workshop inside our site to fabricate Re-Bar for our Building C Structure.
FORM-WORK FABRICATION WORKSHOP (BUILDING C)
We have a workshop inside our site to fabricate Form-Work for our Building C Structure.
P2_SLAB REINFORCEMENT WORK (BUILDING C)
Installation of Reinforcement for P2 Floor Slab at Building C, activities in this April 2017.
P2_MEP WORK (BUILDING C)
We are installing the piping inside our slab for electrical and water system of P2 Floor before casting the concrete.
P2_SLAB CONCRETE TESTING WORK (BUILDING C)
In this April 2017, We casted concrete for P2 Floor. This is our site activities of concrete testing at site before casting.
P2_SLAB CONCRETE WORK WORK (BUILDING C)
This is P2 Slab concrete work for our Building C at construction site in this April 2017.
P2_COLUMN REINFORCEMENT WORK (BUILDING C)
Now we are P2 Floor, Columns Reinforcement Work activities at our construction site of Building C in this April 2017.
P2_COLUMN & SLAB FORM WORK (BUILDING C)
This P2 Floor, Erection of Columns and Slab Form Work. Now we are preparing to do Concrete Work for P2 Column and 1FL Floor.