[BlockC]Progress in April 2017

By Tuesday May 9th, 2017 Construction Progress

PDF: Bodaiju-Site-Progress-Report_Vol.4-BlockC

RE-BAR FABRICATION WORKSHOP (BUILDING C)
We have a workshop inside our site to fabricate Re-Bar for our Building C Structure.
Picture1 Picture2

FORM-WORK FABRICATION WORKSHOP (BUILDING C)
We have a workshop inside our site to fabricate Form-Work for our Building C Structure.
Picture3 Picture4

P2_SLAB REINFORCEMENT WORK (BUILDING C)
Installation of Reinforcement for P2 Floor Slab at Building C, activities in this April 2017.
Picture5 Picture6

P2_MEP WORK (BUILDING C)
We are installing the piping inside our slab for electrical and water system of P2 Floor before casting the concrete.
Picture7 Picture8

P2_SLAB CONCRETE TESTING WORK (BUILDING C)
In this April 2017, We casted concrete for P2 Floor. This is our site activities of concrete testing at site before casting.
Picture9 Picture10

P2_SLAB CONCRETE WORK WORK (BUILDING C)
This is P2 Slab concrete work for our Building C at construction site in this April 2017.
Picture11 Picture12

P2_COLUMN REINFORCEMENT WORK (BUILDING C)
Now we are P2 Floor, Columns Reinforcement Work activities at our construction site of Building C in this April 2017.
Picture13 Picture14

P2_COLUMN & SLAB FORM WORK (BUILDING C)
This P2 Floor, Erection of Columns and Slab Form Work. Now we are preparing to do Concrete Work for P2 Column and 1FL Floor.
Picture15 Picture16