PDF: Bodaiju-Site-Progress-Report_Vol.19-BlockC
MEP WORK (BUILDING C)
This is our site activities of MEP Work in this July 2018. These are our site progressing activities photos of Bodaiju Building C.
WALL FINISHING WORK (BUILDING C)
This is our site activities of Wall Finishing Work in this July 2018. There are the combination of Brick Work, Plastering Work, Painting and Tiling Work as our wall finishing.
CEILING WORK (BUILDING C)
This is our site activities of Ceiling Work of Building C in this July 2018. We start from Framing, Paneling, Joining and Painting as the finishing.
FLOOR FINISHING WORK (BUILDING C)
This is our site activities of Floor Finishing Work with tiling of building C in this July 2018.
FITTING OUT WORK (BUILDING C)
This is our site activities of Fitting Out Work of building C in this July 2018. Door and Windows Installation progress activities photos.
ROOF TOP LANSCAPE WORK (BUILDING C)
This is our site activities of Landscape Work of building C on the roof top in this July 2018.